Rate Analysis of PCC
(Plain Cement Concrete)


     This is used at below any foundation to make a clean and level surface for easy to work, away from sand, dust, mud, etc. This is the temporary structure created to ease your work. PCC is not a Structural Member which can bear any load or pressure. But this plays a very important role when foundation work is going on. PCC will help to keep it as per measurement and as per design.

Sometimes the natural ground has too much uneven surface, in those situations, there is doing Plum concrete. That means 60% of Natural Hard Stone and 40% of Plain Cement concrete will fill with doing some shuttering work to control Size. This will help to create a plain Surface to ease the work.

General Use of Plain Cement Concrete (PCC)

1. Below Footing
2. Below Raft
3. Below Concrete Road
4. Below Grade Slab
5. Below Box type Waterproofing
6. At Labour Camp
7. Work Station of Labour Like Steelyard, Cutting yard, etc.
8. In Godown or Store Room.
9. In Site office.
10. In Plum Concrete at uneven Surface.

In above location, PCC can be done at Normally to work easily.
but What about Plum Concrete Work. Plum Concrete is used at Uneven surfaces to Fill it by Plum Concrete of 60% of Rubble and 40% of Plain Cement Concrete.
sometimes plum concrete can be used at Low bearing capacity soil, but This should be used for small structure not for Building, tower or any big structure because Plum concrete is also not a structural member who can bear load and pressure.

Here we have given some example of Rate analysis of Plum Concrete and Plain Cement concrete (PCC).


Rate Considered: (All Rate is Basic Rate Taxes and Transportation to consider extra)
Cement: Rs. 265.00/Bag
Crush Sand: Rs. 1095.00/cum i.e. Rs. 3100/Brass
Course Aggregate 10mm: Rs. 953.00/cum i.e. Rs. 2700/Brass
Course Aggregate 20mm: Rs. 953.00/cum i.e. Rs. 2700/Brass
Fly Ash: Rs. 2.00/Kg
Admixture: Rs. 48/Liter up to M25 or Rs. 66/Liter above M30
Labour: Rs. 805/Cum
Extra Overheads: Rs.950/Cum (This cost considered Including Transportation, Shifting, Water Electricity, Housekeeping, PF/ESIC.Etc.)

 In General Condition Lot of builders and Subcontractors are sublating this work on Sqft basis or Per Bag basis to Subcontractor or Concrete gang Who can do it on PCC Rs. 6.00/ Sqft and Plum Concrete in 8.50 to 9.00 Rs. Per Cuft that is 300 Per Cum



PLUM CONCRETE (60:40)Ratio

Quantity : 1.00 Cum



Material
Labour
Material
Unit
Constant
Rate
Amount
Total Amount
Labour
Unit
Quantity
Rate
Amount
Total Amount
Cement
Bags
1.15
       265
        305.70
1311.50
Labour work for RCC
Cum
1.00
450.00
        450.00
         981.60 
Crush Sand
Cum
0.20
    1,095 
        216.68
Material handling charges
0.5%
      6.56
Course Aggregate 10- 12 mm
Cum
0.10
       953
          99.08
Overheads
Cum 
1.00 
525.00 
525.00 
Course Aggregate 20 -25 mm
Cum
0.25
       953
       236.12
Fly ash
Kg
33.60
           2
        50.40 
Rubble 
Cum
0.60
        673
  403.54


TOTAL RATE: Rs. 2293.10/Cum Say Rs.2294.00/Cum
(Shuttering Cost is Extra)

Rate And Material Analysis of PCC: Plain Cement Concrete


 PCC 05 (1:4:8)

Quantity: 1.00 Cum

Material
Labour
Material
Unit
Constant
Rate
Amount
Total Amount
Labour
Unit
Quantity
Rate
Amount
Total Amount
Cement
Bags
2.06
       265
        545.90
2208.51
Labour work for RCC
Cum
1.00
805.0847
        805.08
         1,766.1
Crush Sand
Cum
0.67
    1,095
        729.82
Material handling charges
0.5%
          11.04
Course Aggregate 10- 12 mm
Cum
0.31
       953
        297.74
 Overheads
Cum 
1.00 
950.00 
950.00 
Aggregate 20 -25 mm
Cum
0.47
       953
        451.44
Fly ash
Kg
84.00
           2
        126.00 
Admixture up to M30
Kg
1.20
         48
          57.60

TOTAL RATE: Rs. 3974.60/Cum Say Rs. 3975.00/Cum
(Shuttering Cost is Extra)


 PCC M10 (1:3:6)

Quantity: 1.00 Cum

Material
Labour
Material
Unit
Constant
Rate
Amount
Total Amount
Labour
Unit
Quantity
Rate
Amount
Total Amount
Cement
Bags
2.88
       265
        764.26
2327.54
Labour work for RCC
Cum
1.00
805.0847
        805.08
         1,766.7
Crush Sand
Cum
0.49
    1,095
        541.70
Material handling charges
0.5%
          11.64
Course Aggregate 10- 12 mm
Cum
0.26
       953
        247.69
 Overheads
Cum 
1.00 
950.00 
950.00 
Course Aggregate 20 -25 mm
Cum
0.62
       953
        590.29
Fly ash
Kg
84.00
           2
        126.00
Admixture up to M30
Kg
1.20
         48
          57.60

TOTAL RATE: 4094.30 Say Rs. 4095.00/Cum
 (Shuttering Cost is Extra)

PCC M15 (1:2:4)

Quantity : 1.00Cum

Material
Labour
Material
Unit
Constant
Rate
Amount
Total Amount
Labour
Unit
Quantity
Rate
Amount
Total Amount
Cement
Bags
4.94
       265
     1,310.16 
2967.24
Labour work for RCC
Cum
1.00
805.0847
        805.08
         1,769.9
Crush Sand
Cum
0.58
    1,095
        631.73
Material handling charges
0.5%
          14.84
Course Aggregate 10- 12 mm
Cum
0.34
       953
        325.98
Overheads
Cum 
1.00 
950.00 
950.00 
Course Aggregate 20 -25 mm
Cum
0.56
       953
        531.52
Fly ash
Kg
73.50
           2
        110.25
Admixture up to M30
Kg
1.20
         48
          57.60

TOTAL RATE: 4737.20 Say Rs. 4740.00/Cum
(Shuttering Cost is Extra)


In above analysis, We have Considered the Material Density as Follows.

1. Cruah Sand : 1600 Kg/Cum
2. 10mm Metal : 1560Kg/Cum
3. 20mm Metal: 1550kg/Cum

All the Details are given in mix design report which is prepared for your site and the mix design depends on quarry material. Material Density can be changed as per Quarry location and Material quality, as well as Cement content, can be changed as per quarry Material quality.

Generally A lot of Builders, contractors are using thumb rule when doing PCC work.

 General The market rate of PCC work.

PCC with Material: Rs. 3500-4000/Cum
PCC only Labour: Rs.400/Cum
100 to 150mm thick PCC only Labour: Rs.6.00/Sqft
Plum Concrete Only Labour: Rs.8.50-9.00/Cuft That is 300/Cum
Cement Bag: Rs.50- 60/Bag.
Shuttering With Material: Rs.450-550/ Sqm 


All above Rates is current market rate and analysis are considered as per Mix design report. Which is Change as per the location and Mix Design Report, 
you can refer the format and can try preparing your site analysis as per your site mix design.

If you need its soft copy in excel format with formula please mail us on director.cbec@gmail.com




Team